Projects - Case Studies - Residential (High Rise)

Canada Quays

Main Contractor: Barratt Homes (East London) Ltd

Architect: KDS Associates Ltd

Order Value: £5,455,000

Dates: August 2010 ongoing

Scope of works: Design; LSF (EOS); Render (Dry-Vit); Timber Cladding (Western Red Cedar); Soffits (CPB); Aluminium Fascia; Aluminium Cladding; Screed; Plastering; Dry-lining

Poplar Place,
Thamesmead, London

Main Contractor: Denne Construction

Architect: Stefan Zins Associates

Order Value: £2,370,000

Dates: September 2007 to December 2008

Scope of works: Draughting; Lightweight Steel Framing; Sheathing Board; External Insulation; Breather Membrane; Taylor Maxwell Terracotta Rainscreen Cladding; Sto Insulated External Render; Copings, Flashings & Trims; Screeding; DryLining; Partitioning; Suspended Ceilings


The Armories,
Royal Arsenal
Building 10,
Royal Woolwich Arsenal

Main Contractor: Berkeley Homes (East Thames)

Architect: A&Q Partnerships

Order Value: £5,500,000

Dates: January 2009 to present

Scope of works: Full Design Responsibility; Lightweight Steel Framing; Sheathing Board; External Insulation; Breather Membrane; Sto Insulated External Render; Trespa Rainscreen Cladding; Alucobond Rainscreen Cladding; Bailey I-Line; Copings, Flashings & Trims; Screeding; DryLining; Partitioning; Suspended Ceilings

PDF Download case study

Elmgrove House,
Plumstead, London

Main Contractor: Galliford Try Partnerships

Architect: Alan Camp

Order Value:£2,500,000

Dates: August 2010 to present

Scope of works:Full Design; Lightweight Steel Framing; Sheathing Board; External Insulation; Breather Membrane; External Render; Trespa Rainscreen Cladding; Petrarch Cladding; Copings, Flashings & Trims; Aluminium Windows & Doors; SBD Communal Entrance Door; Screeding; DryLining; Partitioning; Suspended Ceilings

PDF Download case study


GWQ - Great West Quarter,
Brentford, London

Main Contractor: Barratt (West London)

Architect: Assael

Order Value: £7M

Dates: Ongoing

Scope of works: Full Design Responsibility; Lightweight Steel Framing; Sheathing Board; External Insulation; Corium Brick Slip Cladding; StoTherm M & K System; Western Red Cedar Cladding; Aluminium Copings, Flashings & Trims; Scaffolding & Mast Climber Access; Screeding; DryLining; Partitioning; Suspended Ceilings

PDF Download case study

St Andrews,
Bromley-by-Bow, London

Main Contractor: Barratt (East London)

Architect: Allies and Morrison - Maccreanor Lavington - Glen Howells

Order Value: £8.5M

Dates: Ongoing

Scope of works:Full SFS Design; Lightweight Steel Framing; Sheathing Board; External Insulation; Brick Tie Channels; Screeding; DryLining; Partitioning; Suspended Ceilings

PDF Download case study


East Side Plaza,
Gunwharf Quays, Portsmouth

Main Contractor: Berkeley Homes (Hampshire)

Architect: Scott Brownwigg

Order Value: £1.5M

Dates:

Scope of works: Lightweight Steel Framing; Sheathing Board; External Insulation; Sto Insulated External Render; Screeding; DryLining; Partitioning; Suspended Ceilings

St Luke's Square,
Canning Town, London

Main Contractor: Mizen Design & Build Ltd

Architect: OSEL Architects

Order Value:£2,000,000

Dates: November 2010 to present

Scope of works:Full Design Responsibility; Lightweight Steel Framing; Sheathing Board; External Insulation; Breather Membrane; Sto Insulated External Render; Trespa Rainscreen Cladding; Flashings & Trims; Screeding; DryLining; Partitioning; Suspended Ceilings

PDF Download case study


Cambridge Riverside,
Cambridge

Main Contractor: Berkeley Homes

Architect: Stock Wolstencroft

Order Value: £1.6M

Dates: August 2011 to ongoing

Scope of works: Screeding; DryLining; Partitioning; Suspended Ceilings

One Brighton,
New England Quarter, Brighton

Main Contractor: Denne Construction

Architect: Fielden Clegg Bradley

Order Value: £2,000,000

Dates: Completed

Scope of works:Full Design Responsibility; NBT Insulated External Render; Terracotta Rainscreen Cladding; Copings, Flashings & Trims; Screeding; DryLining; Partitioning; Suspended Ceilings


Tottenham Hale Village,
Tottenham

Main Contractor: Wilmott Dixon Housing

Architect: BDP Architects

Order Value: £3.2M

Dates: Ongoing

Scope of works:Screeding; DryLining; Partitioning; Suspended Ceilings